More than $40 million for regional bridge, culvert and intersection upgrades in SA

Detailed design, planning and site inspections will commence immediately on $40 million worth of bridge, culvert, road widening and intersection upgrades across regional South Australia following the awarding of a contract to McConnelI Dowell Construction Pty Ltd.

Construction will commence later this year with works expected to be completed in mid-2019, weather permitting, and support 106 jobs.

The upgrades will include:

  • Widening and guard rail upgrades on the Sturt Highway at Bookmark Creek Bridge (Renmark)
  • Widening and guard rail upgrades on the Sturt Highway at Salt Creek Bridge (Renmark)
  • Construction of a shared use path and bridge adjacent Bookmark and Salt Creek road bridges on the Sturt Highway
  • Widening and guard rail upgrades on the Sturt Highway of the River Murray Flood Plains bridges at Paringa
  • Widening guard rail upgrades on the Sturt Highway of Kingston Bridge (Kingston on Murray)
  • Replacement of Inverbrackie Bridge on Onkaparinga Valley Road near Woodside
  • An intersection upgrade at Onkaparinga Valley Road and River View Road, Woodside
  • Widening of the Rocky River Bridge on the Augusta Highway
  • Replacement of Altona Bridge on Barossa Valley Way near Lyndoch
  • Replacement of Farrell Flat Bridge on Farrell Flat Road near Farrell Flat
  • Replacement of Farrell Flat culvert on Farrell Flat Road near Farrell Flat
  • Replacement of Lyndoch Bridge on the Barossa Valley Way near Lyndoch
  • Widening of Skillies Bridge on Balaklava Road near Auburn
  • Replacement of Stott Highway Bridge on Stott Highway near Angaston
  • Various bridge and culvert upgrades on the route between Murray Bridge and Lobethal.

Promotions